Infrastructure

Vidyalaya Infrastructure
 
I
Area of land allotted (in acres)
 
Whether land transferred in
the Name of Samiti
 
Vidyalaya shifted to
permanent buildings on
 
: 26 acres
 
:  Y
 
 
:
ii
Status of Boundary Wall
 
a. Brick Wall
b. Barbed wire fencing
 
: (Completed)
 
Brick Wall
iii
Permanent buildings
constructed
: (CBRI pattern)
 
 
iv
School building
: Complete
 
 
 
v
Dormitories
: Boys 5 Nos.
 
 
 
 
: Girls 2 Nos.
 With Warder Residence 2  Nos
 
 
vi
Kitchen/dining Hall
No. of shifts required for all students to take food
: Complete
  One shift
vii
Principal Residence
: 1  No
viii
Staff Quarters
: Type III=16 Nos.
 Type II= 12 Nos.
 Type I= 10 Nos.
SP Sheds converted into staff Qrs : _______10__ Nos.
ix
M.P. Hall
: Available
x
Workshop
: Available
xi
Type of O.H. Tank
Its capacity
Presents Status
: column based
: 1.32 gallo litres
: Working satisfactory
xii
U.G. tank
Its capacity
Present Status
 
: 1.32 litres
Working satisfactory
 
xiii
D.G. Set
: Available
: Kirloskar  make
: 25+10 KV
: Working
: Year of procurement 2010, 1990
xiv
Sewage Pump
: 3 H.P.
xv
Water Pump
: 15 HP capacity
xvi
Electrification
Electric connection
Sub Station building
Street lighting
Numbers of hrs. during day when power supply is available on an average
 
: Rural
: Complete
: 50 Nos of Poles
: ________hrs.
 
xvii
Playfields
400 metre track
40x30 metre basket ball court
40x30 metre volley ball court
 
: Available
: 2  Nos . - Available
: Not available
xviii
Water Supply
Tube Well
Hand Pump
Connection from PHED
 
: Potable, 1 Nos. – working
: Potable, Nil
: ______ hours supply in a day
xix
Rajiv Gandhi Smriti Van
Available
xx
Fire fighting arrangement
Working
xxi
Last date of cleaning of
(a)    Septic tank
(b)   Water tanks
 
xxii
Whether area around transformer is fenced
Yes
xxiii
Whether open wells, if any, are covered from top
 
 
 
 
No
xxiv
Works taken up under M&R fund during current year and last year:-
 
Year
 
Name of work (M&R)
 
Expenditure (Rs. In lacs)
Cumulative expenditure during the year